NewTrue Portfolio backtests

From idea to tested algo in minutes, not months.

Build any strategy visually, backtest on real tick data, optimise, and export to MT5 as an EA that trades it for you. No code required.

Start building
From $79/month. 30-day money-back guarantee.
01Build02Backtest03Optimise04Deploy
Strategy canvasBacktest trade log on chartOptimisation results

Build any strategy with drag-and-drop nodes. No code.

"Just backtested more than 4,700 trades over 5 years in about 3 minutes. Insane platform."

RomanRoman · Manual trader, now running algos on Voren
The manual ceiling

Effort was never the problem.

You did the work. Manual trading still limits what you can test, trust and execute. Voren removes the repetitive work while you stay in control.

Trading by hand
Running on Voren
✕You can't watch every setup

Valid entries fire at 3am, during work, or in another session's hours. Your availability decides which ones you catch.

✓Every valid setup taken, 24/7

Your strategy runs on MT5 and executes whenever its conditions are met, without you watching the chart.

→
✕Manual backtests are hard to trust

Weeks of testing can still be distorted by hindsight or inconsistent decisions. When drawdown comes, you question the rules.

✓Evidence you can trust

Test the same rules across years of tick data, including bid-ask spreads and trading costs.

→
✕You can't scale a human

Every extra symbol or session adds charts, testing and review. Your capacity is tied to your hours, not your ideas.

✓Run a portfolio, not one idea

Run diversified strategies across markets without duplicating the manual workload or adding more screen time.

→

Your ideas set the ceiling. Your availability no longer does.

How it works

Build. Backtest. Optimise. Deploy.

01Build on the node canvas

Any strategy logic from scratch. Timing, filters, entries, execution, risk gates and trade management, wired visually. No fixed templates.

Node canvas
02Backtest on real ticks

Tick-by-tick execution on 10+ years of real bid-ask data, with commissions and swaps. Equity curve, full metrics and a trade log for every run.

Backtest overview
03Optimise the parameters

Test every combination of your settings in one run instead of one backtest at a time. Heatmap, surface and scatter views show which settings are genuinely robust and which just got lucky.

Surface
X-Axis
Profit Target▼
Y-Axis
Stop Loss▼
Z-Axis
Total Profit▼
6000400020000
04Deploy to MT5

When the numbers hold up, export with one click. MT5 handles live execution on any broker, on your account, under your control.

MQ5
DonchianBreakout.mq5
38 KB · Expert Advisor
✓Exported · full source included
MetaTrader 5
MetaTrader 5
Your broker · your account
Running live
▶︎See it done for real4 min
The edge is the portfolio

A single strategy isn't the bet. The portfolio is.

A good algo does one thing well. Alone, that looks unimpressive. Together, it changes everything.

Run several unrelated strategies at once. One rests, another works. Stack enough of them and the combined return climbs higher, and far smoother, than any single strategy could.

You still call the shots. They just move up a level: what to build, test and run, instead of every trade.

Turn strategies on and off to see what happens to the drawdown.
Portfolio
Portfolio return
+42%
Portfolio max drawdown
−12.5%
Each strategy alone
−12.5%
✓
When one strategy sits in drawdown, the others are usually working.
Simple, validated edges combine into a smoother portfolio curve.

Indicative equity curves for illustration. Not a performance claim.

Now on Max

Test the portfolio, not just the parts

A True Portfolio backtest runs up to 8 of your strategies on one account balance, tick by tick. See the combined curve, the drawdown and what each strategy contributes, then export the whole portfolio to MT5.

True Portfolio backtest results: combined net profit curve, drawdown, and each strategy's curve and contribution

Portfolio backtest results in Voren. Historical, simulated results. Not a performance claim.

Build your first portfolio strategy today
Six months from now you'll either have a tested portfolio or the same grind: watching sessions, second-guessing entries, wondering if the edge is real.
Start building
Evidence

Evidence you can trust

Most backtesters approximate from OHLC candles and a fixed spread. Voren executes every trade against real tick data, so the equity curve you see is the one you would have traded.

Trades on an integrated TradingView chart, with the trade log belowCreate New Backtest window: Dukascopy data, tick modelling, date range, and the commission and swap for the symbolCost settings page: commission, swap type, long and short swap and triple swap day for each symbol
Entries, exits, stops, targets and indicators, trade by trade on an integrated TradingView chart.
Ownership

No black box. No lock-in.
The code is yours.

Voren never touches your live account. Your strategies run on your own terminal, on your own broker, under your control.

You build it

Every rule is visible on the canvas, and the exported MQL5 is readable source. What you see is exactly what runs.

You validate it

Tested on real ticks, with the full trade log behind every result. Export to Excel or CSV whenever you want the raw numbers.

You own it

The .mq5 file is yours permanently, on any MT5 broker. It keeps running if you cancel.

Who it's for

Built for traders willing to do the work.

Voren is built for you if
✓You trade with rules, or you're ready to start
✓You've outgrown manual backtesting and want real data behind every decision
✓You want to own and understand every strategy you deploy
It's not for you if
✕You're looking for signals or a bot to buy
✕You want profits without doing the thinking
✕You've never placed a trade before

No strategy ideas yet? Every account includes several pre-built strategies to study, test and adapt. Ideas are the easy part once the testing takes minutes.

Testimonials

Traders who made the switch

"I put my first strategy live on MT5 and watched it take the right trades at the right times, over and over. That's when it actually felt real."

Bruno
Bruno D.
Voren user

"That first backtest ran in 3 minutes. Manually, that would have taken a year."

Joe
Joe B.
Voren user

"Just backtested more than 4,700 trades over 5 years in about 3 minutes. Insane platform."

Roman
Roman
Voren user

"This is a great chunk of software. The optimization tool is probably the 'BOOM'. All in all, absolutely awesome."

Gary
Gary VDH.
Voren user
The alternatives

Three ways to validate a strategy

Whether you backtest by hand or write your own EAs, the bottleneck is the same: the loop from idea to evidence is too slow.

Manual backtesting
Coding it yourself
Voren
Testing one idea
Months of chart replay
Days of writing and debugging
Minutes, on 10+ years of ticks
Data quality
Your own logs, gaps and hindsight bias
Whatever feed you wire up
Real ticks with bid-ask spreads
Adding a symbol
Doubles your workload
More code to maintain
Duplicate the strategy, rerun
Changing a rule
Start the sample again
Rewrite, recompile, retest
Edit a node, rerun
Where your research lives
Scattered spreadsheets and screenshots
Your own folders, if you're disciplined
One workspace, every run saved
Live execution
You, at the screen, every session
Your code, your bugs
MT5 runs the exported EA
Optimising parameters
Impossible by hand
Build your own optimiser
Every combination in one run
Skills required
Patience, and then more patience
MQL5 or Python, maintained forever
Your trading knowledge. No code.
Pricing

Build on Pro. Scale on Max.

Both plans include the full strategy workflow: building, backtesting on real tick data, optimisation, and MT5 export. Max adds True Portfolio backtests and gives you more of everything else. Allowances reset monthly.

✓
30-day money-back guarantee on both plans. Build your first strategy. If it is not for you, get your money back.
Pro
Build, test, and validate your strategies
Start here
$79/ month · cancel anytime
Start building
✓Visual strategy builder, no coding required
✓Backtesting on real tick data, with every trade visualised on the chart
✓Parameter optimisation
✓Unlimited MQ5 exports, yours to keep
✓Monthly compute allowance for backtests and optimisations
✓AI strategy assistant included
✓Quickstart course, pre-built strategies, and private community
Max
Portfolio backtests and more capacity
For portfolio builders
$159/ month · cancel anytime
Get Max
Everything in Pro, plus:
✓3x compute allowance
✓True Portfolio backtests: up to 8 strategies on one account balance
✓Larger optimisation sweeps
✓More tests running at once
✓Larger AI assistant allowance
✓Priority access at high traffic times
Cancel anytime
Switch plans anytime
Secure checkout with Stripe
Compare plans in detail →
FAQ

Questions traders ask

Do I need to know how to code?
−

No. Strategies are built visually on the node canvas: timing, filters, entries, execution, risk gates and trade management. If you can describe your rules, you can build them. If you already write MQL5 or Pine Script, you'll simply iterate much faster.

Can a mechanical strategy really replace my judgment?
+
Which plan should I start on?
+
What happens if I use all my compute allowance?
+
Can I use it on a prop firm account like FTMO?
+
What data does the backtester use?
+
What markets can I test?
+
What happens to my strategies if I cancel?
+
How hard is Voren to learn?
+
Do I need a powerful computer?
+
Which brokers does it work with?
+
Does Voren run my live trading?
+

Prove your edge. Deploy it with confidence.

Build and test your first strategy today.

Start building
30-day money-back guarantee on both plans.

Risk disclaimer: trading foreign exchange and CFDs on margin carries a high level of risk and may not be suitable for all investors. Past performance, including backtested results, is not indicative of future results. You should not invest money you cannot afford to lose. Voren is analysis and strategy-development software; it does not provide investment advice, signals or managed trading.

© 2026 Voren. All rights reserved.